BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//The Von Corporation - ECPv6.16.2//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-ORIGINAL-URL:https://www.voncorp.com
X-WR-CALDESC:Events for The Von Corporation
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:UTC
BEGIN:STANDARD
TZOFFSETFROM:+0000
TZOFFSETTO:+0000
TZNAME:UTC
DTSTART:20190101T000000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=UTC:20200818T080000
DTEND;TZID=UTC:20200819T114500
DTSTAMP:20260526T004358
CREATED:20200125T031859Z
LAST-MODIFIED:20200125T031859Z
UID:663-1597737600-1597837500@www.voncorp.com
SUMMARY:Electrical Testing of Insulated Aerial Lift Devices
DESCRIPTION:Insulated aerial lift devices are used extensively throughout the electric utility industry to provide both primary and secondary electrical protection to the utility worker. This training program is for personnel that conduct high voltage tests on insulated aerial lifts\, those that have supervisory responsibility for such work\, and those in the safety department. The program includes acceptance and maintenance testing both articulating and telescoping lift trucks. The program also includes use of continuous current monitors for bare hand hot line work.
URL:https://www.voncorp.com/event/electrical-testing-of-insulated-aerial-lift-devices-4/
LOCATION:Drury Inn & Suites Birmingham\, Lakeshore Drive 160 State Farm Pkwy\, Birmingham\, AL\, 35209\, United States
ORGANIZER;CN="VON Corporation":MAILTO:voncorp@voncorp.com
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=UTC:20200818T080000
DTEND;TZID=UTC:20200819T114500
DTSTAMP:20260526T004358
CREATED:20200125T031859Z
LAST-MODIFIED:20200125T031859Z
UID:797-1597737600-1597837500@www.voncorp.com
SUMMARY:Electrical Testing of Insulated Aerial Lift Devices
DESCRIPTION:Insulated aerial lift devices are used extensively throughout the electric utility industry to provide both primary and secondary electrical protection to the utility worker. This training program is for personnel that conduct high voltage tests on insulated aerial lifts\, those that have supervisory responsibility for such work\, and those in the safety department. The program includes acceptance and maintenance testing both articulating and telescoping lift trucks. The program also includes use of continuous current monitors for bare hand hot line work.
URL:https://www.voncorp.com/event/electrical-testing-of-insulated-aerial-lift-devices-4-2/
LOCATION:Drury Inn & Suites Birmingham\, Lakeshore Drive 160 State Farm Pkwy\, Birmingham\, AL\, 35209\, United States
ORGANIZER;CN="VON Corporation":MAILTO:voncorp@voncorp.com
END:VEVENT
END:VCALENDAR